Welcome to Magazine Premium

You can change this text in the options panel in the admin

There are tons of ways to configure Magazine Premium... The possibilities are endless!

Member Login
Lost your password?
Not a member yet? Sign Up!


Rossi Suggests More Than Transmutation Taking Place

August 20, 2012
By

Here’s an interesting exchange from Andrea Rossi’s Journal of Nuclear Physics:

Dear dr. Rossi,
last few months I carry in my mind this question:

a) A sum of output energy from E-Cat is equivalent to sum of all transmuted materials plus all energy inputs ?

or
b) A sum of output energy from E-Cat is many times bigger then equivalent of all transmuted materials (in fuel) plus all energy inputs ?

I have this heretic hypothesis, that b) is in order.

Dear Guru:
b) is better.
Warm Regards,.
A.R.

There has been a lot of speculation on the theoretical basis of LENR reactions — different theories have been proposed. Andrea Rossi rarely discusses his theory behind the operations of the E-Cat, often saying that he will only make his theory public once patents have been secured. He has said however that through the years that he has been working on his discovery that he feels they now have a good understanding of what is going on — and that his understanding has changed over time. In fact, he says the ability to produced the high heat of the ‘hot cats’ came about because of a new level of understanding. Now he suggests that more than transmutation accounts for the energy produced in the reaction.


155 Responses to Rossi Suggests More Than Transmutation Taking Place

  1. wolfgang gaerber on August 22, 2012 at 9:12 am

    ==== W O W ====

    b) A sum of output energy from E-Cat is many times bigger then equivalent of all transmuted materials (in fuel) plus all energy inputs ?

    I have this heretic hypothesis, that b) is in order.

    ================
    This would imply that the effect is not in line with general relativity.

    If true – this might be a fancy key to “Dark Matter”.

  2. Ivan Mohorovicic on August 21, 2012 at 6:09 pm

    It looks like Cobraf forum, for those interested in following Cures, is back up.

  3. Torbjörn on August 21, 2012 at 5:45 pm

    The E-Cat emits 50-150 keV and 511 keV radiation. The 511 keV radiation comes from electron/positron annihilation.

  4. Renzo on August 21, 2012 at 11:07 am

    Daniele Passerini, who knows a lot of inside informations but doesn’t like to reveal confidential data, has published an interesting comment:

    “Now more than ever I believe that patience is a virtue and that it is useless to step on the accelerator of a car going downhill that already sees the destination it longed for, you may just slide it at the final corner. September 8 will bring many new elements. In October there will be an important event in Italy. After National Instruments in relation to LENR in general, another big and important multinational will come into the open soon, in this case as a partner of Rossi! And soon there will be industries with 1 MW installed and running, I hope here in Italy.”

    I presume the big and important multinational is Siemens…

    http://22passi.blogspot.com/2012/08/riassunto-della-storia-di-andrea-rossi.html#comment-form

    • Alain on August 21, 2012 at 1:18 pm

      do you have the link ?

    • LCD on August 22, 2012 at 2:38 am

      Nothing passerini ever says about rossi amounts to anything interesting. So if hes talking about it it worries me.

    • timycelyn on August 26, 2012 at 8:10 am

      Sometimes Daniele’s comments are appetite whetting, but opaque. For once, this set chimes well with what is now leaking out elsewhere, and it seems a pretty clear list, (altho still less than 100% certain) viz:

      1. September 8th distributors conference (agenda does look interesting!) will reveal some significant new facts, not just ra-ra team cheering.

      2. In October -as Rossi announces on his blog – UNIBO will present their testing report on E cat and Hot Cat.

      3. Siemens will come out as a partner of Rossi. No date – ‘Soon’

      4. With the confirmation by Rossi of completion of certification of industrial systems, they can now be sold to others outside of the military. Given his lead times, possible military order book, shipping times and installation times, I am giving it 6 months – no later than Easter, before we get some factory or other going ‘We’ve got one and it really works..’

Polls

What is Your View of the Recent Hot Cat Photo?

View Results

Loading ... Loading ...

Support ECW With a Subscription

Suggested Subscription Options

Support E-Cat World by Using the Box Below for Your Amazon Shopping




Powered by WP Symposium - Social Networking for WordPress v13.02